Warehouse Refurbishment Whether it is for dividing a single open floor into multiple rooms with mezzanine flooring above or re-cladding the wall, we have over 25 years experience in the industry.

Industrial Door Removal

Industrial Door removal by Gem Building Specialists Limited. We started with providing a temporary frame with sheeting to protect the inside of the warehouse whilst the doors and supports were cut away and new steels installed.

We then set about the removal of 2 huge sliding concertina doors and then replacing with new steels to which new matching cladding was fixed to create a new solid external wall.

Cladding was provided thanks to National Cladding in Wales who had the closest colouration to the original panels in stock which was chosen by the client from a range of samples and signed off for and onsite support was provided by Symes Engineering whom we approached as a recognised leader in industrial steel fabrication .